Migration guide: annualised auction yield

From Friday 23 October 2026 (CET), auction rates move to an APR (365-day year, simple interest) and every auction carries an explicit rateBasisSeconds. This page lists what you must change and when. For the full field reference, see Onboarding § Auction pricing fields and Pricing an offer.

  • rateBasisSeconds on every auction. GET /v1/auction returns it on every auction. It is the period expectedReturn is earned over, fixed when the auction is created:
    • 31536000 (365 days) on annual auctions: every auction created after its vault switches to APR pricing, and every retarget auction.
    • The asset’s settlement delay in seconds on legacy auctions, created before their vault switched (for example 2678400 for a 31-day FalconX auction). Legacy auctions behave exactly as auctions do today. Expect a few right after the cutover, while auctions opened before it finish.
  • maxRate is always an APR in basis points (tenths precision), on annual and legacy auctions alike. It ramps over the Dutch auction, for example from 1095 to 1825 on JAAA, so read it close to submission.
  • One signing rule for every auction: expectedReturn = floor(amount × aprBps × rateBasisSeconds / (10_000 × 31_536_000)).
  • Wrong-basis offers are rejected. POST /v1/offer returns 400 Bad Request when the offer’s APR is above maxRate or below a quarter of the lowest APR on the auction’s ramp. See the bounds.
  • Offers that are too small are refused. If you keep your current configuration and sign the per-term figure on an annual auction, the implied APR is far below that floor (for example about 4.1 bps on JAAA, against a floor of 273.75 bps), so the offer is rejected instead of being filled at a near-zero rate. If your pricing is not updated by the cutover, your offers are refused.
  • Repayment on annual auctions is ceil(expectedReturn × paidSeconds / rateBasisSeconds), where paidSeconds counts whole days: at least 1 day, with day 2 starting at 30 hours, day 3 at 54 hours and so on (1 hour → 1 day, 30 hours → 2 days), capped at 365 days. Legacy auctions keep today’s rule, floor(expectedReturn × elapsed / rateBasisSeconds) with elapsed rounded to the nearest whole day, so a loan repaid in under 12 hours earns no yield. See How yield is repaid.
  • The Offer and SubmitPushOffer EIP-712 typed data, the POST /v1/offer body, and every endpoint path and field name.
  • Outstanding loans. Loans funded before the cutover keep their expectedReturn, their basis and their repayment amount. Nothing is re-priced and there is nothing to do on-chain.
  • The Request contract. PT is still 1:1 with principal, the amount of YT minted still equals the signed expectedReturn (prorated to the fill), and the Request still pulls only the principal. On an annual auction that expectedReturn is a full year of yield, so YT no longer redeems at about 1.0: a loan repaid the next day pays one day at your APR, and each YT is worth about 1/365 of a unit.

Before the cutover, maxRate is the yield for the auction’s term and expectedReturn is priced per term:

// Before: maxRate and your bid are bps for the auction's term.
const termBps = 4n; // e.g. 4 bps for a 1-day JAAA term
const expectedReturn = (amount * termBps) / 10_000n;

After the cutover, price in APR and scale by the auction’s rateBasisSeconds:

const YEAR_SECONDS = 31_536_000n;
/** aprTenthsBps: your APR in tenths of a basis point (1500 bps = 15000n). */
function expectedReturnFor(
amount: bigint,
aprTenthsBps: bigint,
auction: { rateBasisSeconds?: number | null },
): bigint {
const basis = auction.rateBasisSeconds;
if (basis == null || !Number.isSafeInteger(basis) || basis <= 0) {
// Never assume 365 days. A missing basis means a pre-cutover API: do not
// apply this rule (see "Before the cutover").
throw new Error("rateBasisSeconds unavailable; refusing to sign");
}
return (amount * aprTenthsBps * BigInt(basis)) / (100_000n * YEAR_SECONDS);
}
// Annual JAAA auction: 1,000,000 USDC at 15% APR → 150,000 USDC
expectedReturnFor(1_000_000_000_000n, 15_000n, { rateBasisSeconds: 31_536_000 }); // 150000000000n
// Legacy FalconX auction: 1,000,000 USDC at 11% APR → 9,342.465753 USDC
expectedReturnFor(1_000_000_000_000n, 11_000n, { rateBasisSeconds: 2_678_400 }); // 9342465753n

Use integer (bigint) arithmetic and round down. Floating-point maths can round an offer just above maxRate and get it rejected.

  • Update your pricing. Express your bid as an APR, then derive expectedReturn with the rule above. Compare your APR against maxRate directly; it is already an APR.
  • Read rateBasisSeconds from every auction. Do not hard-code 31536000 or the settlement delay: legacy auctions keep their old basis for their whole life. Fail closed (do not sign) when the field is missing.
  • Treat repayment as prorated. Expected yield is about expectedReturn × elapsed / rateBasisSeconds (see How yield is repaid for the exact rounding), not expectedReturn. Update any reporting, reconciliation or interest display that assumed amount + expectedReturn.
  • Review contract floors. If you use SimplePush or SimplePull, size minOutput from principal plus the yield accrued over the expected term, not PT + YT. A floor that is already set too high can be lowered with setMinOutput (push) or setRequestMetadata (pull).
  • 3F console users: reload every open console tab after Friday 23 October 2026 so the page signs with the new rule.
  • Test on development (https://bf.dev.gcp.3f.xyz) once it is migrated: submit one offer on an annual auction and confirm that an offer priced on the old per-term basis is rejected with 400.

Until Friday 23 October 2026 (CET) the API does not return rateBasisSeconds and maxRate is still the per-term rate. If you ship before the cutover, branch on the field: when rateBasisSeconds is present, use the new rule; when it is absent, keep your current pricing. Never fill in a missing basis yourself. After the cutover every auction carries the field and you can remove the old path.